Cleanfill - Auckland
New Haruru Road Cleanfill now open to accept your fill. Located at 782 Haruru Road, Wainui, Auckland. Site limited to 30 truckloads average a day. 782 Cleanfill also accepts Green Waste. Please mention Bartercard at time of booking.
Log onto www.782cleanfill.co.nz to get forms and open account.
For more information please contact us on:
Phone: (09) 420 3063
Mobile: (027) 494 4484 - Charles
Mobile: (027) 777 1220 - Dan
Email: charles@782cleanfill.co.nz
Price List - June 2019
All prices exclude GST and are subject to change without notice.
*By prior arrangement only
|
|
4W |
6W |
8W |
C |
Dry compactable cleanfill |
80 |
110 |
145 |
CUS |
Damp cleanfill (requires mixing to compact) |
100 |
150 |
200 |
Mix |
Unsuitable, wet or mixed cleanfill* |
165 |
250 |
335 |
SLOP |
Wet cleanfill (requires drying & mixing)* |
300 |
450 |
600 |
T |
Topsoil |
85 |
125 |
165 |
TD |
Topsoil - Damp |
100 |
150 |
200 |
CONC |
Concrete <200mm* |
80 |
120 |
160 |
RC1 |
Reinforced concrete or masonry* |
300 |
450 |
600 |
|
|
|
|
|
GREEN |
Green Waste - natural, untreated, unpainted plants and trees |
235 |
350 |
465 |
STUMP |
Large stumps over 300mm diameter; price per each - additional* by prior arrangement only |
20 |
20 |
20 |
Dry compactable cleanfill - means cleanfill with a low moisture content (<5%) which can be integrated into the fill site with no further modification.
Damp cleanfill - means cleanfill with a higher moisture content and which can only be integrated into the fill site when mixed with the same quantity of dry cleanfill.
Wet cleanfill - means cleanfill which has to be dried before it can be integrated into the fill site or mixed with more than the same quantity of dry cleanfill.
Green waste - means natural, untreated, unpainted plants and trees. Large stumps over 300mm diameter incur an additional charge.
Please also refer to our Terms & Conditions, available on our website www.782cleanfill.co.nz .